TOF structure for gluing 9 modules

Jan 2013

Main detector:

Location:

Activity:

Scintillators are loaded horizontally then the internal mount is rotated 90 degrees to glue 9 light guides one end. After a 24 hr cure, the system is rotated 180 degrees for gluing of the opposite end light guides. After final curing of the optical cement, the system was rotated horizontally for module inspections and removal. A total of 9 modules ( 8 standard bars + 1 half-width bar ) were processed during one glue cycle.